Sub Code: - 1618405
2019(Even)
Time : 3Hrs
Semester IV(New)
SAMIS
Full Marks : 70
Pass marks : 28
Group A
Choose the most suitable answer from the following options: - (1*20=20)
(i) Actual programming of software code is done during the ____ step of SDLC.
(a) Maintenance and Evaluation
(b) Design
(c) Analysis
(d) Development and Documentation
(ii) Problem analysis is done during
(a) System design phase
(b) System analysis phase
(c) Before system test
(d) All of the above
(iii) Which is not the phase of SDLC?
(a) Feasibility study
(b) Design
(c) Analysis
(d) Presentation
(iv) System analyst has to interact with
(a)Managers of organization
(b) Users in the organization
(c) Programming team
(d) All of the above
(v) Coding and testing are done in a
(a) Top-Down manner
(b) Bottom-up manner
(c) Ad hoc manner
(d) Cross sectional manner
(vi) By technical feasibility of a solution we mean that
(a) Technology is available to implement it
(b) Persons are available to implement it
(c) Person has technical ability to implement it
(d) Funds are available to implement it
(vii) After the design phase the document prepared is known as-
(a) System specification
(b) Performance specification
(c) Design specification
(d) None of the above
(viii) Spiral model is divided into ________ task regions
(a) 3
(b) 6
(c) 5
(d) 4
(ix) _________ is a black box testing method:
(a) Boundary value analysis
(b) Basic path analysis
(c) Code validation analysis
(d) None of the above
(x) Project planning is done using:
(a) Gantt
(b) Spiral model
(c) COCOMO
(d) DFD
(xi) The __________ symbol is used in flowchart to represent a step that gets information from the user
(a) Process
(b) Start/ Stop
(c) Input/ Output
(d) Selection/ Repetition
(xii) In a DFD external entities are represented by a
(a) Rectangle
(b) Ellipse
(c) Diamond shaped box
(d) Circle
(xiii) The main objective of system modification is
(a) To use the latest software tools
(b) To meet user’s new/ changed need
(c) To use the latest hardware
(d) To has the most modern system
(xiv) By Meta data we mean
(a) Very large data
(b) Data about data
(c) Data directory
(d) Meaningful data
(xv) Software validation says
(a) It satisfies the use requirement
(b) It satisfies the business requirement
(c) Checks errors in program
(d) None of the above
(xvi) Black box testing is carried out
(a) To rest functionality of the program
(b) To test load
(c) To test security
(d) None of the above
(xvii) Which of the following technique and notations would you find within UML?
(a) Use cases
(b) Class diagrams
(c) State diagrams
(d) All of the above
(xviii) UML stands for
(a) Unified Modeling Language
(b) Unique Modeling Language
(c) Universal Model Language
(d) None of the above
(xix) Changes made periodically to a system after its implementation, is called
(a) System analysis
(b) System review
(c) System maintenance
(d) None of these
(xx) ___________ Is a measure of the degree of interdependence between modules.
(a) Cohesion
(b) Coupling
(c) Analysis
(d) None of the above
Group:-"B"
➥ Answer all
Five Questions: -
(5*4=20)
OR
What is cost/benefit analysis?
Explain 3. Differentiate between logical design and physical design.
OR
Describe various levels of DFD
with suitable diagram4. Differentiate between verification and validation.
OR
What is business process
re-engineering? Explain.5. Explain various types of software maintenance.
OR
Explain various criterions for
form design.6. What is the role of information in decision making? Explain
OR
What is UML? Explain static and
dynamic modeling
Group:- "C"
➥ Answer all
Five Questions: -
(5*6=30)
OR
What is system? Write elements
of system. Give information system and explain any two.8. Write short notes on the following:
a. Modern methods for determining system
requirement.
b. Prototyping
OR
Explain coupling with its types.
Write the importance of cohesion9. Write short notes on the following:
a. CASE tools
b. Data modeling
OR
What is GUI? Explain design
activities.10. Discuss object-oriented modeling and compare it with module oriented approach.
OR
Why testing is important?
Explain role of black box and white box testing.11. Define MIS. Explain the development process of MIS.
OR
Define DSS. How Simon’s model is usefull decision making. Explain